Upper Clinch Streambank Sedimentation Project
The project focuses on reducing sedimentation in the upper Clinch River watershed through streambank stabilization projects. Methods will include bioengineering techniques, grading, and installation of toe protection. Projects will be concentrated in developed areas of the watershed, as well as collaboration with the local soil and water conservation district.
Smaller geography (stream reach, county-level etc.)
Project ID | 2016FWS086 |
---|---|
Project Leader: | |
Contact phone (work) | 804-832-5144 |
Participating Organizations/Partners |